8.3 PT31 Torch
Test Procedure for PT31XLPC torch
Equipment Required:
A. Supply of 100 PSI Air or Nitrogen gas with regulator.
B. Test xture P/N PG-071-16.
C. Reference documents:
Description PT-31
Assembly drawings 20072
Instruction Manual F-14-246-J
Visual Inspection:
Determine that all components are properly located and securely
mounted. Check copper tube for proper angle and tightness; watch
for interference with other connections and shorts. Check power
cable connector for damaged threads.
Test Set-Up:
A. Verify that the power switch on bench is in the OFF position.
B. Verify that the bench Nitrogen switch is in the OFF position.
C. Verify that the bench Leak I switch is in the OFF position.
D. Connect the Nitrogen gas hose from xture to supply line.
E. Attach the PT-31 torch to test xture mark Torch Connection.
Test:
A. Turn the power switch on bench to the ON position.
B. Turn Nitrogen switch to bench test xture ON.
C. Turn the Leak I switch on bench test xture ON.
D. Verify that the valve on ow meter is to the ON position.
E. Adjust the pressure regulator is to read 45 PSI on pressure
gauge.
F. Observe the ball in the ow meter. If any reading of CFH the
torch body is bad.
G. Turn the Leak I switch on bench test xture OFF.
Final Check:
If the visual checks of the torch and test items E and F are
accomplished satisfactorily, then remove torch from test xture and
identify as tested and passed.